Northern line

The Northern line is a London Underground line that runs from south-west to north-west London, with two branches through central London and three in north London. It runs northwards from its southern terminus at Morden in the borough of Merton to Kennington in Southwark, where it divides into two central branches, one via Charing Cross in the West End and the other via Bank in the City. The central branches re-join at Camden Town where the line again divides into two branches, one to High Barnet and the other to Edgware in the borough of Barnet. The High Barnet branch has an additional single-station spur at Finchley Central with a shuttle train to Mill Hill East.

For most of its length it is a deep-level tube line.[nb 1] The portion between Stockwell and Borough opened in 1890 and is the oldest section of deep-level tube line on the Underground network. There were about 294 million passenger journeys recorded in 2016/17 on the Northern line, making it the busiest on the Underground.[4] It is unique in having two different routes through central London and two northern branches. Despite its name, it does not serve the northernmost stations on the network, though it does serve the southernmost station, Morden, as well as 16 of the system's 29 stations south of the River Thames. There are 50 stations in total on the line, of which 36 have platforms below ground.

The line has a complicated history, and the current complex arrangement of two main northern branches, two central branches and the southern route reflects its genesis as three separate railways, combined in the 1920s and 1930s. An extension in the 1920s used a route originally planned by a fourth company. Abandoned plans from the 1920s to extend the line further southwards, and then northwards in the 1930s, would have incorporated parts of the routes of two further companies. From the 1930s to the 1970s, the tracks of a seventh company were also managed as a branch of the Northern line.[nb 2] An extension of the Charing Cross branch from Kennington to Battersea is currently under construction, which may either give the Northern line a second southern branch or may see it split into separate distinct lines with their own identities. It is coloured black on the current Tube map.
The core of the Northern line evolved from two railway companies: the City & South London Railway (C&SLR) and the Charing Cross, Euston & Hampstead Railway (CCE&HR).

The C&SLR, London's first deep-level tube railway, was built under the supervision of James Henry Greathead, who had been responsible, with Peter W. Barlow, for the Tower Subway. It was the first of the Underground's lines to be constructed by boring deep below the surface and the first to be operated by electric traction. The railway opened in November 1890 from Stockwell to a now-disused station at King William Street. This was inconveniently placed and unable to cope with the company's traffic so, in 1900, a new route to Moorgate via Bank was opened. By 1907 the C&SLR had been further extended at both ends to run from Clapham Common to Euston.
The CCE&HR (commonly known as the "Hampstead Tube") was opened in 1907 and ran from Charing Cross (known for many years as Strand) via Euston and Camden Town (where there was a junction) to Golders Green and Highgate (now known as Archway). It was extended south by one stop to Embankment in 1914 to form an interchange with the Bakerloo and District lines. In 1913 the Underground Electric Railways Company of London (UERL), owner of the CCE&HR, took over the C&SLR, although they remained separate companies.

Integration
During the early 1920s, a series of works was carried out to connect the C&SLR and CCE&HR tunnels to enable an integrated service to be operated. The first of these new tunnels, between the C&SLR's Euston station and the CCE&HR's station at Camden Town, had originally been planned in 1912[5] but had been delayed by World War I. The second connection linked the CCE&HR's Embankment and C&SLR's Kennington stations and provided a new intermediate station at Waterloo to connect to the main line station there and the Bakerloo line. The smaller-diameter tunnels of the C&SLR were expanded to match the standard diameter of the CCE&HR and the other deep tube lines.

Extensions
In conjunction with the works to integrate the two lines, two major extensions were undertaken: northwards to Edgware in Middlesex (now in the London Borough of Barnet) and southwards to Morden in Surrey (then in the Merton and Morden Urban District, but now in the London Borough of Merton).

Edgware Extension
The Edgware extension used plans dating back to 1901 for the Edgware and Hampstead Railway (E&HR)[6] which the UERL had taken over in 1912. It extended the CCE&HR line from its terminus at Golders Green to Edgware in two stages: to Hendon Central in 1923 and to Edgware in 1924. The line crossed open countryside and ran on the surface, apart from a short tunnel north of Hendon Central. Five new stations were built to pavilion-style designs by Stanley Heaps, head of the Underground's Architects Office, stimulating the rapid northward expansion of suburban developments in the following years.

Morden Extension
The engineering of the Morden extension of the C&SLR from Clapham Common to Morden was more demanding, running in tunnels to a point just north of Morden station, which was constructed in a cutting. The line then runs under the wide station forecourt and public road outside the station, to the depot. The extension was initially planned to continue to Sutton[7] over part of the route for the unbuilt Wimbledon and Sutton Railway, in which the UERL held a stake, but agreements were made with the Southern Railway to end the extension at Morden. The Southern Railway later built the surface line from Wimbledon to Sutton, via South Merton and St. Helier.[nb 3] The tube extension opened in 1926, with seven new stations, all designed by Charles Holden in a modern style. Originally, Stanley Heaps was to design the stations, but after seeing these designs Frank Pick, Assistant Joint Manager of the UERL, decided Holden should take over the project.[8]

With the exception of Morden and Clapham South, where more land was available, the new stations were built on confined corner sites at main road junctions in areas that had been already developed. Holden made good use of this limited space and designed impressive buildings. The street-level structures are of white Portland stone with tall double-height ticket halls, with the London Underground roundel made up in coloured glass panels in large glazed screens. The stone columns framing the glass screens are surmounted by a capital formed as a three-dimensional version of the roundel. The large expanses of glass above the entrances ensure that the ticket halls are bright and, lit from within at night, welcoming.[9] The first and last new stations on the extension, Clapham South and Morden, include a parade of shops and were designed with structures capable of being built above (like many of the earlier central London stations). Clapham South was extended upwards soon after its construction with a block of apartments; Morden was extended upwards in the 1960s with a block of offices. All the stations on the extension, except Morden itself, are Grade II listed buildings.

Naming
The resulting line became known as the Morden–Edgware line, although a number of alternative names were also mooted in the fashion of the contraction of Baker Street & Waterloo Railway to "Bakerloo", such as "Edgmor", "Mordenware", "Medgway" and "Edgmorden".[10] With Egyptology very much in fashion after the discovery of the tomb of Tutankhamun in 1922, there was also a proposal to call the line the Tootancamden Line as it passed through both Tooting and Camden.[11] It was eventually named the Northern line from 28 August 1937,[12] reflecting the planned addition of the Northern Heights lines.[13]

Great Northern & City Railway
After the UERL and the Metropolitan Railway (MR) were brought under public control in the form of the London Passenger Transport Board (LPTB) in 1933, the MR's subsidiary, the Great Northern & City Railway, which ran from Moorgate to Finsbury Park, became part of the Underground as the Northern City Line. In preparation for the Northern Heights Plan, it was operated as part of the Northern line, although it was never connected to it.